Thursday, February 26, 2009

Basketball Practice Facility Visit on 2/26

A worker was making concrete on site

A few workers were working on connecting new utility lines to the existing ones. This photo was taken along Washington Street, near the main entrance to the site is located.


Significant progress has taken place at the front of the site. The grand staircase is visible and in place. Workers were installing long metal strips near the staircase.


Workers were continuing to install hokie stone along the backside of the site.



This photo shows the storage of new materials delivered to the site today. The materials seemed to be windows and metal panels.




A forkflift takes the windows and metal panels off the flat bed truck and puts it into the appropraite storage location